Project Opportunities

Sectors
No. of Projects
Country
Denmark, Ghana, Malawi, Senegal, South Africa, Zambia, Zimbabwe
Denmark, Lesotho, Malawi, Rwanda, South Africa, Zambia, Zimbabwe
South Africa, Zambia
Denmark, Lesotho, Mali, Rwanda, South Africa, Zambia, Zimbabwe
South Africa, United Arab Emirates, Zambia
Denmark, Rwanda, South Africa, Zambia
Denmark, Mali, South Africa, Zambia, Zimbabwe
Malawi, South Africa, Zambia
Rwanda, South Africa, Zambia
Malawi, Rwanda, Senegal, South Africa, Zambia
Denmark, Malawi, South Africa, Zambia, Zimbabwe
Denmark, India, Malawi, Rwanda, South Africa, Zambia
Rwanda, Senegal, South Africa, Zambia, Zimbabwe
Malawi, South Africa, Zambia
Malawi
Sr No.
Project Description
Sectors
Total Value (US$ Million)
1
(i) Intake and Raw water Main a) New water source on Lake Malawi with an abstraction capacity of 163 l/s. b) Raw water pumping main capable of conveying 585 m3/h with a total length of 11 Km; (ii) Water treatment works, Pump stations and storage reservoirs a) Treatment plant capable of producing 14,056 m3/day; b) 3No. high lift pumps (each with discharge of 100 l/s and total manometric head of 95 m); c) 2No. 1500 m3 and 2No. 1000 m3 storage reservoirs; (iii) Transmission and distribution syst...Read More
Consultancy, Infrastructure, Power & Energy
45.60
2
(i) Intake and Raw water Main a) Rehabilitation and upgrading of 30 Km of transmission and distribution lines ranging from 63 mm to 300 mm DN; b) Installation of new water source on Lake Malawi with an abstraction capacity of 10,152m3/day; c) Installation of 4 Km raw water pumping main capable of conveying 423 m3/h. (ii) Water treatment works, Pump stations and storage reservoirs a) Installation of water treatment plant capable of producing 10,710 m3/day. The plant will comprise 2 No. hydrauli...Read More
Consultancy, Infrastructure, Power & Energy
38.90
3
(i) Groundwater sources with a capacity of 53 l/s; (ii) Raw water transmission mains from boreholes to water treatment plant (WTP); (iii) WTP with a capacity of 191 m3/h comprising 150 m3 Sump and Clear water pumping station with two (2) sets of pumps. Set 1 has a total discharge of 101 m3/h and total dynamic head (TDH) of 60 m for delivery to T1 tank; and set 2 has a total discharge of 103 m3/h and TDH of 56 m for delivery to T2 tank; (iv) 3.3Km clear water rising main (CWRM) 1 with DN200 DI, P...Read More
Consultancy, Infrastructure, Power & Energy
10.33
4
(i) Groundwater sources with a capacity of 30 l/s; (ii) Raw water pumping main of DN 200mm and of 0.3 Km length; (iii) WTP with a capacity of 90 m3/h; (iv) Clear water transmission main of length 8.5Km, DN200 mm; (v) Construction of 2 No.1500 m3 storage tank; (vi) Installation of 4No. high lift pumps (2No. with discharge of 21 L/s, total manometric head of 24 m; 2No with discharge of 18 l/s and head of 115m); (vii) 28.3 Km reticulation system (ranging from DN 63mm to 200mm).
Consultancy, Infrastructure, Power & Energy
13.64