Online registrations are closed now. On-spot registrations would be available at the event venue (The Maslow, Sandton) from 10:00 hrs on 31st October 2022.

On-spot registrations are available only on a first-come-first-serve basis. Limited seats available.

Project Opportunities

Sectors
No. of Projects
Country
Denmark, Ghana, Malawi, Senegal, South Africa, Zambia, Zimbabwe
Denmark, Lesotho, Malawi, Rwanda, South Africa, Zambia, Zimbabwe
South Africa, Zambia
Denmark, Lesotho, Mali, Rwanda, South Africa, Zambia, Zimbabwe
South Africa, United Arab Emirates, Zambia
Denmark, Rwanda, South Africa, Zambia
Denmark, Mali, South Africa, Zambia, Zimbabwe
Malawi, South Africa, Zambia
Rwanda, South Africa, Zambia
Malawi, Rwanda, Senegal, South Africa, Zambia
Denmark, Malawi, South Africa, Zambia, Zimbabwe
Denmark, India, Malawi, Rwanda, South Africa, Zambia
Rwanda, Senegal, South Africa, Zambia, Zimbabwe
Malawi, South Africa, Zambia
South Africa
Sr No.
Project Description
Sectors
Total Value (US$ Million)
1
The feasibility study has been done and the project capex is US$735m. The project spans over two countries and all the contracts are in place and the feasibility study done. The interested party can also just bring in loan finance if not interested in participating in the project as a supplier of goods and services. Full documentation will be made available to interested potential partners.
Infrastructure
735.00
2
This is a very profitable project at an off-take tariff of US$0.09 per kwh. A pre-feasibility study has been done and it shows that the project is highly feasible. The duration of the PPA is 20 years. We are ready to move forward with this project as soon as we get a partner on a JV or a funder and we do the project ourselves. The project is for 150MW; and right now we want to start with phase 1, a total of 50MW at US$48.5m.
Power & Energy
48.50
3
The project comprises 10 000 000 metres of fibre optic cable to be supplied, installed, operated and maintained in the Metropolitan Municipality ( with a population of about 4.1m people ). The fibre will be used be the various ISPs in South Africa and this will become the second third largest service provider in South Africa. The contracts are in place and we are waiting to find a JV partner or funder.
Information and Communication Technology
300.00
4
We have been awarded a licence to set up as an Internet Service Provider in a country with about 100m people on the African continent. The project comprises some 5000 sites / towers complete with the main switch and vending platform. The required capex is US$500m and the project pays for itself in 48 months. We urgently require funding of US$500m to start the project right now, because the licences and the land where the masts will be installed is available. we require a large ISP to partner wi...Read More
Information and Communication Technology
500.00
5
We have various licences to mine cobalt, copper, platinum, gold, diamonds, etc. and we are looking for a partner to work with us in joint venture. The various project values are still to be determined together with our potential JV Partner.
Mining
3.00
6
We have a letter of intent for offtake of 100 000 metric tons of maize per annum with the largest buyer of maize in South Africa. We have the land to grow the maize in an idean area where we will not need to water the maize ( corn ) in South Africa. We are looking for a JV partner who has the funding as well as expertise to do the business. The off-take will provide specific seeds and will do own harvesting in our fields and take the produce to their premises. The required funding to get this pr...Read More
Agriculture & Allied Services
6.00
7
We have been granted various minerals and we have been requested to set up a fund in SADC which will be used to fund various projects. We do not have the estimated investment required to set up the Fund. We only have the required value of the Fund, which is US$5bn.
Financial Services
2.00
8
This project comprises the building of a primary, secondary, high school in Johannesburg. There are'nt enough schools in Johannesburg and South Africa to provide for all our youth. The land is available ( 2.5Ha ) and the Government is willing to assist us build the school. It is planned that the school will open its doors in January 2024. The business is very lucrative and will payback the loan in less than 48 months.
Other
17.50
Prev Next Page : 1 of 1